Cooling Tower Inspections            

                                                                                                                                                MEMBER

 

Home Page

CoolingTowerBidEvaluation

CoolingTowerConstruction

CoolingTowerDesignEvaluation

CoolingTowerExpert

CoolingTowerImprovements

CoolingTowerInspections

CoolingTowerSeminars

CoolingTowerServices

CoolingTowerSpecifications

CoolingTowerStructuralAnalysis

CoolingTowerTesting

CoolingTowerVibration

 

 

Cooling Tower Inspections.   Fulkerson & Associates, Inc. provides an inspection service where we inspect the rotating mechanical equipment, the water distribution system and all of the tower internals. We also inspect the complete structure of the cooling tower. The tower may be constructed from wood, fiberglass, steel or concrete. The strength of the wood used in cooling towers declines with long exposure to water at elevated temperatures. If a wood tower is designed according to CTI codes and standards the physical properties of the wood such as, the modulus of elasticity and the compression strength of the wood are adjusted so the tower will have a life of fifty years. The tower should be able to withstand operating loads, wind loads, and seismic loads for fifty years.  This would be true if the structure has not been damaged.  The structure, however, can be damaged by such things as biological attack, chemical attack, Iron rot, or fans out of balance Etc. Regular thorough inspections are necessary to properly maintain cooling towers throughout their operating life.

        Click on the links at the left to view some of the other services we offer.

Key Benefits of tower inspections

bullet

Pinpoint problems which may be reducing a tower's thermal performance.

bullet

Determine extent of damage or fowling in the tower's fill and water distribution system.

bullet

Locate problems which may reduce the useful life of a cooling tower.

bullet

Find biological attack before it spreads throughout the tower.

bullet

Avoid catastrophic failure or collapse of a cooling tower.

bullet

Evaluate adequacy of maintenance program.

bullet

Construction inspection and monitoring; Make sure you get all of what you paid for.

 Capabilities

Members of our team have many years of experience in cooling tower designing, construction, inspection and testing.  We know what to look for, where to look for it, and how to recognize potential problems when they exist.

 

 

  

 

 

 

 

 

 

 

 

Home ] Up ]

Send E-mail to bob@ctEngr.com with your questions or comments.